SPECIALTY HAULAGE SOLUTIONS FOR CONSTRUCTION AND MINING MEGA CORP.®700 Osuna Rd. N.E. • Albuquerque, NM 87113 • 1-800-345-
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 2 System Description 2-2 Trailing Axle Frame Assembly The trailing bogie is constructed of squa
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 2 System Description 2-3 MHT AXLE & WHEEL GROUP The MHT trailer axle and wheel group is the sa
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 2 System Description 2-4 Electronic The system consists of a roller switch mounted on the h
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 2 System Description 2-5 Brake Valve & Slack Adjuster Groups The MHT is configured with two different
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 2 System Description 2-6 MHT DOOR SYSTEM The system is comprised of two hinged doors, activation cylinders, h
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 2 System Description 2-7 Intermediate Door Position Indicator (If Equipped) A system that contains a c
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 2 System Description 2-8(Blank)
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 3 Limitations Contents 3-1 Maximum Allowable Weights ………..… 3-1 MHT Gooseneck …………………..…… 3-1 MAXIMUM ALLOWAB
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 3 Limitations 3-2(Blank)
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 4 Normal Operations Contents 4-1 Maximum Allowable Weights………… 4-1 Weight & Dimensions ……………..….. 4-1 B
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 4 Normal Operations 4-2 BEFORE OPERATIONS These procedures are used to perform a walk-around inspection of the
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 4 Normal Operations 4-3 4. Positioned MHT for loading within the load markers. 5. Transmission Control
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 3 Normal Operations 4-4 Hitch ball oscillations greater than 12° will result in hitch ball contact
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 4 Normal Operations 4-5 16. RH Door Hydraulic Cylinders, Structure Cavity Drain Holes and Lights – CHE
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 3 Normal Operations 4-6 9. While machine is running and parking brake function is assured, check reconfigu
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 5 Performance Loading 5-1 MHT LOADING Figure 5-1 illustrates correct load placement and height.
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 5 Performance Loading 5-2(Blank)
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 6 Appendix 6-1 MHT175-CAT777(G)CL-1 1 Aug 2012 MHT175 OPERATORS CHECKLIST
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 6 Appendix 6-2 MHT175-CAT777(G)CL-1 1 Aug 2012 TABLE OF CONTENTS Title Page 1. BEFORE OPE
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 6 Appendix 6-3 MHT175-CAT777(G)CL-1 1 Aug 2012 BEFORE OPERATIONS These procedures are used to perfo
MHT175-CAT777(G)-1 1 Aug 2012 TABLE OF CONTENTS A Page Section 1. Definitions and Abbreviations …………………………………………………...…. 1-1 Section 2.
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 6 Appendix 6-4 MHT175-CAT777(G)CL-1 1 Aug 2012 7. Upper Deck Assembly – CHECKED FOR DAMAGE AND SECURITY
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 6 Appendix 6-5 MHT175-CAT777(G)CL-1 1 Aug 2012 15. Tail Lights Assemblies – CHECKED FOR DAMAGE 16. RH Do
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 6 Appendix 6-6 MHT175-CAT777(G)CL-1 1 Aug 2012 LOADING 1. Hoist Control Lever – LOWER (Doors fully
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 6 Appendix 6-7 MHT175-CAT777(G)CL-1 1 Aug 2012 TRANSITING WITH A LOAD 1. While driving periodically sc
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 6 Appendix 6-8 MHT175-CAT777(G)CL-1 1 Aug 2012 5. Hoist Control Lever – HOLD UNLOADING (Moving) It i
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 6 Appendix 6-9 MHT175-CAT777(G)CL-1 1 Aug 2012 5. When opening the dump doors they should not be opened
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 6 Appendix 6-10 MHT175-CAT777(G)CL-1 1 Aug 2012 9. If there is any hesitation passing through the float
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 6 Appendix 6-11 MHT175-CAT777(G)CL-1 1 Aug 2012 6. Upper Hitch and Hydraulic Hosing – CHECKED FOR
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 6 Appendix 6-12 MHT175-CAT777(G)CL-1 1 Aug 2012 14. Tail Light Assemblies – CHECKED FOR DAMAGE 15.
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 6 Appendix 6-13 MHT175-CAT777(G)CL-1 1 Aug 2012 INSPECTION 1. Vehicle Engine – AS REQUIRED 2. Chocks
MHT175-CAT777(G)-1 1 Aug 2012 TABLE OF CONTENTS B(Blank)
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 6 Appendix 6-14 MHT175-CAT777(G)CL-1 1 Aug 2012 Brake Activation Manifold (LT) B. Grease port tra
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 6 Appendix 6-15 MHT175-CAT777(G)CL-1 1 Aug 2012 8. Vehicle Engine – Start 9. While machine is runn
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 6 Appendix 6-16 MHT175-CAT777(G)CL-1 1 Aug 2012 15. At 3-5 MPH activate the service brake to ensur
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 1 Definitions and Abbreviations Contents 1-1 Description ………………………….….… 1-1 Warnings, Cautions & Notes ……
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 1 Definitions and Abbreviations 1-2 Top View 3 7 3 4 4 Side Vi
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 1 Definitions and Abbreviations 1-3 ABBREVIATIONS ft - feet gpm – gallons per minute kg – kilograms km/h – k
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 1 Definitions and Abbreviations 1-4(Blank)
MHT175-CAT777(G)-1 1 Aug 2012 SECTION 2 System Description Contents 2-1 Coal Hauler Body (MHT) ………...…... 2-1 MHT Axle & Wheel Group ……...
Kommentare zu diesen Handbüchern